All FYP2 participants need to present their final year project on 24th April. The Industry Day start from 9:00 am to 2:00pm and will be held at Dewan Gemilang. The presentation was going smoothly but unfortunately, a tripping happen where some of the FYP project damaged due too many load. As the tripping happened, my GSM stop working due to short circuit. Luckily, all the part except the GSM module working perfectly fine.
۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞
Subscribe to:
Post Comments (Atom)
Week 18: The Submission
In this final week of the semester, I have done the report hardcover, all the document that needed to submitting online and ready to submit....
-
On the last chapter, which is chapter 5 is conclusion for the project. This chapter is attached with some recommendation that can be used by...
-
Gsm is an open and digital cellular technology used for transmitting mobile voice and data services operates at the 850Mhz, 900MHz, 1800MHz ...
-
AT89S52 The AT89S52 is designed with static logic for operation down to zero frequency and supports two software selectable power saving m...