All FYP2 participants need to present their final year project on 24th April. The Industry Day start from 9:00 am to 2:00pm and will be held at Dewan Gemilang. The presentation was going smoothly but unfortunately, a tripping happen where some of the FYP project damaged due too many load. As the tripping happened, my GSM stop working due to short circuit. Luckily, all the part except the GSM module working perfectly fine.
۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞۞
Subscribe to:
Post Comments (Atom)
Week 18: The Submission
In this final week of the semester, I have done the report hardcover, all the document that needed to submitting online and ready to submit....
-
On this week, I only focus on my thesis to complete the chapter 1 and chapter 2. Chapter 1 consist of the introduction of the project and ...
-
Assalamualaikum On 13/2/2019, all FYP 2 candidates have to attend the briefing located at TTL2. The briefing was intended to explain about...
-
On the last chapter, which is chapter 5 is conclusion for the project. This chapter is attached with some recommendation that can be used by...